Contractor selection for green buildings based on the fuzzy Kano model and TOPSIS: a developer satisfaction perspective
Author(s): |
Jin Cai
Zhongfu Li Yudan Dou Yue Teng Mengqi Yuan |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management, August 2022, n. 10, v. 30 |
Page(s): | 5073-5108 |
DOI: | 10.1108/ecam-01-2022-0054 |
- About this
data sheet - Reference-ID
10689650 - Published on:
13/08/2022 - Last updated on:
10/02/2024