Contract models for TBM drives in hard rock - codes in Austria and Switzerland and their practical implementation / Vertragsmodelle für TBM Vortriebe im Festgestein - Regelwerke in Österreich und der Schweiz und deren praktische Umsetzung
Author(s): |
Eckart Schneider
Markus Spiegl |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2012, n. 1, v. 5 |
Page(s): | 17-30 |
DOI: | 10.1002/geot.201200003 |
Abstract: |
The Austrian standard conditions of contract for underground works with continuous tunnelling have been available since 2005. Until then, contract conditions for sequential and continuous tunnelling were combined in a single code. In Switzerland, major transport tunnels were already being bored with TBMs at the start of the 1970s, much earlier than in Austria. Corresponding standard conditions have been available there for many years, most recently revised in 2004. In this article, the most important provisions of the Austrian and Swiss conditions of contract are presented and commented. Their implementation on specific projects is described through some significant projects. A comparison between Austria and Switzerland, where there has also been a standard bill of quantities for TBM drives for a long while - the Norm-Positions-Katalog - which is generally accepted and used practically universally, indeed show a basic similarity in the essential points, but in the implementation of the details there are still considerable differences. |
Keywords: |
standard conditions of contract tunneling class matrix standard bill of quantities with specification details ON B 2203-2 SIA 198
|