0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

地下连续墙快速穿越不规则孤石及斜坡岩地层的施工技术 (Construction Technology of Diaphragm Wall through Irregular Boulders and Slope Rock Quickly)

Author(s):
Medium: journal article
Language(s): Chinese
Published in: Hans Journal of Civil Engineering 的中文名称是土木工程, , n. 3, v. 8
Page(s): 539-545
DOI: 10.12677/hjce.2019.83063
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.12677/hjce.2019.83063.
  • About this
    data sheet
  • Reference-ID
    10378327
  • Published on:
    12/11/2019
  • Last updated on:
    12/11/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine