0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

悬臂现浇预应力混凝土连续梁桥合拢段施工技术与工艺计算 (Construction Technology and Process Calculation of Closure Section in Cantilever Cast-in-Place Prestressed Concrete Continuous Girder Bridge)

Author(s):
Medium: journal article
Language(s): Chinese
Published in: Hans Journal of Civil Engineering 的中文名称是土木工程, , n. 4, v. 7
Page(s): 620-625
DOI: 10.12677/hjce.2018.74072
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.12677/hjce.2018.74072.
  • About this
    data sheet
  • Reference-ID
    10378471
  • Published on:
    12/11/2019
  • Last updated on:
    12/11/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine