0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A Construction Technique of Incremental Launching for a Continuous Steel Truss Girder Bridge with Suspension Cable Stiffening Chords

This publication has been cited in the following 3 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10415082
  • Published on:
    02/03/2020
  • Last updated on:
    25/02/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine