0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Construction Risk Analysis Tool for Determining Liquidated Damages Insurance Premiums: Case Study

This publication has been cited in the following 4 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10143927
  • Published on:
    11/12/2018
  • Last updated on:
    17/04/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine