0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The construction of the system of automation of designing of load-lifting cranes of bridge type

Author(s):


Medium: journal article
Language(s): English
Published in: Journal of Physics: Conference Series, , n. 4, v. 1399
Page(s): 044031
DOI: 10.1088/1742-6596/1399/4/044031
Abstract:

The hierarchical structure of load-lifting cranes of bridge type is considered as a complex dynamic system, on the basis of which the entire object is represented by six levels of ranks of elements. Based on the proposed hierarchical structure, the design process is represented by phases of closed design work. As a result, the main stages of modeling the process of designing a load-lifting cranes crane of bridge type, on the basis of which the algorithm of design automation is built, are identified. Thus, the use of modern modeling tools will allow to abandon field experiments, take into account the maximum number of measured parameters, that ultimately significantly reduces production expenses, reduce time and labor costs, achieve optimal characteristics.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1088/1742-6596/1399/4/044031.
  • About this
    data sheet
  • Reference-ID
    10671844
  • Published on:
    28/05/2022
  • Last updated on:
    28/05/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine