新名神高速道路「川下川橋」の施工─部位に応じたコンクリートの検討とその施工実績─ (Construction of the Shin-Meishin Expressway Kawashimogawa Bridge—Consideration and Construction Work of Concrete depending on Various Conditions—)
Author(s): |
T. Iwashima
M. Hada S. Sakamoto S. Yanai |
---|---|
Medium: | journal article |
Language(s): | Japanese |
Published in: | Concrete Journal (JCI), 2013, n. 8, v. 51 |
Page(s): | 641-647 |
DOI: | 10.3151/coj.51.641 |
Structures and Projects
- About this
data sheet - Reference-ID
10438477 - Published on:
08/10/2020 - Last updated on:
08/10/2020