0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

山陰線余部橋りょう改築工事(塩害対策) (Construction of New Amarube Bridge (Technical Challenges to Overcome Damage of Salty Breezes))

Author(s):



Medium: journal article
Language(s): Japanese
Published in: Concrete Journal (JCI), , n. 5, v. 49
Page(s): 5_100-5_104
DOI: 10.3151/coj.49.5_100
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3151/coj.49.5_100.
  • About this
    data sheet
  • Reference-ID
    10438790
  • Published on:
    08/10/2020
  • Last updated on:
    21/03/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine