流動化コンクリート長距離圧送による橋りょう床版の暑中施工 (Construction of Bridge Slab in Hot Weather by Use of Superplasticized Concrete Pumped in Long Distance)
Author(s): |
M. Katoh
T. Kumei H. Umehara H. Yoshida |
---|---|
Medium: | journal article |
Language(s): | Japanese |
Published in: | Concrete Journal (JCI), 1984, n. 9, v. 22 |
Page(s): | 48-55 |
DOI: | 10.3151/coj1975.22.9_48 |
- About this
data sheet - Reference-ID
10442507 - Published on:
08/10/2020 - Last updated on:
08/10/2020