0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Construction of a large-section long pedestrian underpass using pipe jacking in muddy silty clay: A case study

Author(s):


Medium: journal article
Language(s): English
Published in: Tunnelling and Underground Space Technology, , v. 60
Page(s): 151-164
DOI: 10.1016/j.tust.2016.08.009
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.tust.2016.08.009.
  • About this
    data sheet
  • Reference-ID
    10089700
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine