Construction of a deep underground structure by the cut and-cover-method
Author(s): |
Yu. A. Bereznitskii
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Soil Mechanics and Foundation Engineering, November 1988, n. 6, v. 25 |
Page(s): | 532-534 |
DOI: | 10.1007/bf01721613 |
Structure Types
- About this
data sheet - Reference-ID
10204433 - Published on:
11/12/2018 - Last updated on:
11/12/2018