Construction manager’s technical competencies in Malaysian construction projects

Author(s):



Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 2, v. 25
Page(s): 153-177
DOI: 10.1108/ecam-07-2016-0176
Abstract:

Purpose

Problems of Malaysian construction industry have often been associated, in part to incompetent construction manager (CM) when managing the construction projects. Although various education and training provisions have been introduced, critics argue that the provisions have not been effective. Central in the debate on the adequacy of the CM education and training offered is the answer to the question of “what constitutes the technical competency of the CM?” The purpose of this paper is to present the study that identifies the technical competencies required by the CM to address the question.

Design/methodology/approach

Multi-layered thematic analysis of literature was first carried out to identify the technical competency elements. Then, interviews were undertaken to confirm the elements of competencies. It was followed with questionnaire surveys to test the validity of the technical competencies against different contractors’ category and grade/size.

Findings

The findings suggest that the technical competencies of CM are generic, regardless of the size of construction organisation or the types of projects they undertake. A total of 16 CM technical competencies were identified which include the ability to manage: staff, materials, labour, plant, sub-contractors, safety, money, quality, time, environment, site administration, pre-construction activities, project closeout and handover, third parties, computer literacy, and construction contract.

Originality/value

The findings suggest that generic education and training is possible to develop technically competent CM. It also provides insights to the CM technical competencies which the industry is expecting.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ecam-07-2016-0176.
  • About this
    data sheet
  • Reference-ID
    10576629
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine