0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Construction delays in privately funded large building projects in Bangladesh

Author(s):

Medium: journal article
Language(s): English
Published in: Asian Journal of Civil Engineering, , n. 4, v. 19
Page(s): 415-429
DOI: 10.1007/s42107-018-0034-3

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s42107-018-0034-3.
  • About this
    data sheet
  • Reference-ID
    10173569
  • Published on:
    02/12/2018
  • Last updated on:
    02/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine