0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Construction Delays in Indonesia, Malaysia, Thailand, and Vietnam

Author(s):
Medium: journal article
Language(s): English
Published in: Practice Periodical on Structural Design and Construction, , n. 3, v. 24
Page(s): 04019013
DOI: 10.1061/(asce)sc.1943-5576.0000434

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)sc.1943-5576.0000434.
  • About this
    data sheet
  • Reference-ID
    10312580
  • Published on:
    28/04/2019
  • Last updated on:
    28/04/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine