Construction cost effectiveness comparison on I-girder bridge and box culvert

Author(s):


Medium: journal article
Language(s): English
Published in: IOP Conference Series: Earth and Environmental Science, , n. 1, v. 794
Page(s): 012004
DOI: 10.1088/1755-1315/794/1/012004
Abstract:

One of the most important aspects in bridge construction is cost. A study case has been carried out in Balikpapan-Samarinda highway STA 45+990.946. In that specific location, a bridge is needed as a local road. The ongoing project is constructing a 90 m long I-girder concrete bridge. In this research, as opposed to I-girder concrete bridge, box culvert is designed and then calculate the cost. The budget calculation for bridge construction costs refers to the Unit Price Analysis Guidelines (AHS) in the Public Works Sector and General Specifications. Under the AHS Guidelines, work items are divided into 10 job divisions. The recapitulation of the construction cost budget shows that box culvert construction costs are less than I-girderbridge. In earthworks and structural works, it is the most significant cost difference between box culvert and I-girder bridge. In earthworks, the costs required to the box culvert construction is higher than the I-girder bridge construction. Meanwhile, the construction cost of the box culvert in structural works is less than the I-girder bridge.

License:

This creative work has been published under the Creative Commons Attribution 3.0 Unported (CC-BY 3.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10781068
  • Published on:
    11/05/2024
  • Last updated on:
    05/06/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine