0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Concurrent Delays in Construction: International Legal Perspective

Author(s): (Graduate Research Assistant, OHL School of Construction, Florida International Univ., Miami, FL 33174 (corresponding author).)
(Professor of Construction Management, OHL School of Construction, Florida International Univ., Miami, FL 33174.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 1, v. 6
Page(s): 04513001
DOI: 10.1061/(asce)la.1943-4170.0000134
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000134.
  • About this
    data sheet
  • Reference-ID
    10579753
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine