0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Concrete Strength Change of Hamaoka NPS Unit 1 Reactor Building─Research Utilizing Docommissioning Plant─

Author(s):



Medium: journal article
Language(s): Japanese
Published in: Concrete Journal (JCI), , n. 5, v. 56
Page(s): 442-447
DOI: 10.3151/coj.56.5_442
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3151/coj.56.5_442.
  • About this
    data sheet
  • Reference-ID
    10437360
  • Published on:
    08/10/2020
  • Last updated on:
    08/10/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine