Author(s): |
Edwin Kozniewski
Zygmunt Orłowski |
---|---|
Medium: | journal article |
Language(s): | Latvian |
Published in: | Journal of Civil Engineering and Management, March 2003, n. 1, v. 9 |
Page(s): | 52-58 |
DOI: | 10.3846/13923730.2003.10531301 |
Abstract: |
The paper presents the simulation model of concrete mix transportation process in the system—batching centre—a number of construction sites. An essential part of the analysed model is a multi-phase system of queues which emerge in concrete transportation characterised by: waiting time for loading, waiting for discharge, the distances from the plant to construction sites, the number and type of truck mixers used, the types of transport means for on-site deliveries, transportation costs. The paper also includes an example solved with a computer program designed on the basis of an algorithm formulated in the model. |
- About this
data sheet - Reference-ID
10363490 - Published on:
12/08/2019 - Last updated on:
12/08/2019