0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Conceptualization of the Contractor’s Project Management Group Dynamics in Claims Initiation and Documentation Evolution

Author(s): (Professor of Construction Engineering and Management, Dept. of Civil and Environmental Engineering, Faculty of Engineering and Architecture, American Univ. of Beirut, Bechtel Engineering Bldg., P.O. Box 11-0236, Riad El Solh, Beirut 1107 2020, Lebanon (co)
(Graduate Student, Engineering Management Program, Faculty of Engineering and Architecture, American Univ. of Beirut, Bechtel Engineering Bldg., P.O. Box 11-0236, Riad El Solh, Beirut 1107 2020, Lebanon.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 9
Page(s): 04517014
DOI: 10.1061/(asce)la.1943-4170.0000229
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000229.
  • About this
    data sheet
  • Reference-ID
    10579863
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine