Conceptual Estimation of Construction Costs Using the Multistep Ahead Approach
Author(s): |
Onur Dursun
Christian Stoy |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, September 2016, n. 9, v. 142 |
Page(s): | 04016038 |
DOI: | 10.1061/(asce)co.1943-7862.0001150 |
- About this
data sheet - Reference-ID
10170484 - Published on:
02/12/2018 - Last updated on:
02/12/2018