0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Conceptual Cost Estimation Framework for Modular Projects: A Case Study on Petrochemical Plant Construction

This publication lists 63 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10661374
  • Published on:
    28/03/2022
  • Last updated on:
    28/03/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine