0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Computer Vision–Based Disruption Management for Prefabricated Building Construction Schedule

Author(s): ORCID

Medium: journal article
Language(s): English
Published in: Journal of Computing in Civil Engineering, , n. 6, v. 35
Page(s): 04021027
DOI: 10.1061/(asce)cp.1943-5487.0000990
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)cp.1943-5487.0000990.
  • About this
    data sheet
  • Reference-ID
    10631110
  • Published on:
    01/10/2021
  • Last updated on:
    01/10/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine