0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A "Comprehensive" Model for Accelerating the Building Integrated Photovoltaic (BIPV) / Wind Turbine (BIWT) Construction Projects in the Kingdom of Bahrain

Author(s):


Medium: journal article
Language(s): English
Published in: The Open Construction and Building Technology Journal, , n. 1, v. 3
Page(s): 1-11
DOI: 10.2174/1874836800903010001

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.2174/1874836800903010001.
  • About this
    data sheet
  • Reference-ID
    10384818
  • Published on:
    23/11/2019
  • Last updated on:
    29/05/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine