A "Comprehensive" Model for Accelerating the Building Integrated Photovoltaic (BIPV) / Wind Turbine (BIWT) Construction Projects in the Kingdom of Bahrain
Author(s): |
N. W. Alnaser
R. Flanagan W. E. Alnaser |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | The Open Construction and Building Technology Journal, December 2009, n. 1, v. 3 |
Page(s): | 1-11 |
DOI: | 10.2174/1874836800903010001 |
Geographic Locations
- About this
data sheet - Reference-ID
10384818 - Published on:
23/11/2019 - Last updated on:
29/05/2022