A composite dowel bridge in the Czech Republic - Development, optimization and implementation of a railway bridge

Author(s):



Medium: journal article
Language(s): English
Published in: Steel Construction, , n. 3, v. 9
Page(s): 191-199
DOI: 10.1002/stco.201610027
Abstract:

The floods in the Czech Republic in the last few decades have resulted in a significant number of bridges having to be rebuilt. Unfortunately, the work meant long-term traffic closures for railway bridges, coupled with significant costs for renovation and for providing alternative transport services. As a result, the minimum clear headroom above the design flood level required for new bridges and for reconstructing existing bridges has been increased. This initiated a search for new approaches to designing individual parts of bridge crossings, aiming to comply with the stricter conditions. The research aims to decrease costs in comparison with the costs of raising the finished grade level of the railway, especially at places where adjacent sections such as railway stations etc. are connected.

Keywords:
bridge superstructure composite dowel flood pilot project hydrodynamic load verifying
Available from: Refer to publisher

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/stco.201610027.
  • About this
    data sheet
  • Reference-ID
    10073698
  • Published on:
    02/10/2016
  • Last updated on:
    03/10/2016
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine