Compensation Mechanism for Early Termination of Highway BOT Projects Based on ARIMA Model
Author(s): |
Jingbo Song
Yanan Fu Ousseni Bagaya |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | International Journal of Architecture Engineering and Construction |
DOI: | 10.7492/ijaec.2016.006 |
- About this
data sheet - Reference-ID
10378138 - Published on:
10/11/2019 - Last updated on:
03/05/2021