0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Compensation Cost Estimation Model for Construction Noise Claims Using Case-Based Reasoning

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)co.1943-7862.0001675.
  • About this
    data sheet
  • Reference-ID
    10314550
  • Published on:
    24/06/2019
  • Last updated on:
    24/06/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine