0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management

This publication lists 53 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10728510
  • Published on:
    30/05/2023
  • Last updated on:
    01/06/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine