0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Comparison of cost and schedule performance of large public projects under P3 and traditional delivery models: a Canadian study

Author(s):


Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 8, v. 38
Page(s): 1-17
DOI: 10.1080/01446193.2019.1645344
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446193.2019.1645344.
  • About this
    data sheet
  • Reference-ID
    10337811
  • Published on:
    03/08/2019
  • Last updated on:
    11/07/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine