Comparative Study of University Courses on Critical-Path Method Scheduling
Author(s): |
Patricia D. Galloway
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, July 2006, n. 7, v. 132 |
Page(s): | 712-722 |
DOI: | 10.1061/(asce)0733-9364(2006)132:7(712) |
- About this
data sheet - Reference-ID
10162507 - Published on:
07/12/2018 - Last updated on:
07/12/2018