Comparative stability analysis of tailings dams using limit equilibrium and finite element methods
Author(s): |
Jian Zheng
(Department of Geotechnical Engineering, College of Civil Engineering, Tongji University, Shanghai 200092, China)
Michaël Demers Bonin (Formerly WSP Canada Inc. - 7250 rue du Mile End 3rd Floor, Montreal, Québec, Canada) Kermani Mohammad (WSP Canada Inc. - 7250 rue du Mile End 3rd Floor, Montreal, Québec, Canada) Jussi Nousiainen (Agnico Eagle Finland Oy - Kittilä Mine - Pokantie 541 - 99250 Kiistala, Finland) Edouard Masengo (Agnico Eagle Mines Limited – 145 King Street East, Suite 400, Toronto, Ontario, Canada) Marielle Limoges Shaigetz (Agnico Eagle Mines Limited – 145 King Street East, Suite 400, Toronto, Ontario, Canada) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Proceedings of the Institution of Civil Engineers - Geotechnical Engineering |
Page(s): | 1-37 |
DOI: | 10.1680/jgeen.24.00319 |
- About this
data sheet - Reference-ID
10802200 - Published on:
10/11/2024 - Last updated on:
10/11/2024