0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Comparative assessment of construction cost overruns: A case study of regional distribution in Ghana

This publication has been cited in the following 1 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10330415
  • Published on:
    27/07/2019
  • Last updated on:
    18/01/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine