0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Comparative analysis of outcomes under PPP and traditional modes of delivery: a study of schools in Melbourne

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446193.2021.1994147.
  • About this
    data sheet
  • Reference-ID
    10637418
  • Published on:
    30/11/2021
  • Last updated on:
    30/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine