0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The combined effect of marginal social and private benefit on the socially optimal equity structure of PPP projects

This publication has been cited in the following 2 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10637417
  • Published on:
    30/11/2021
  • Last updated on:
    30/11/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine