0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Clear and Unambiguous Language of the Contract Nixes Delay Claim

Author(s): (Professor of Civil Engineering, Penn State Univ., 201 Transportation Research Bldg., University Park, PA 16802.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 1, v. 1
Page(s): 64-66
DOI: 10.1061/(asce)1943-4162(2009)1:1(64)
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)1943-4162(2009)1:1(64).
  • About this
    data sheet
  • Reference-ID
    10579596
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine