0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Clean Heating Scheduling Optimization with Wind Power in Northern China

Author(s): (State Key Laboratory of Power Systems, Tsinghua Univ., Beijing 100084, China (corresponding author).)
(State Key Laboratory of Power Systems, Tsinghua Univ., Beijing 100084, China.)
(State Key Laboratory of Power Systems, Tsinghua Univ., Beijing 100084, China.)
(Dispatching and Communication Center, Inner Mongolia Power (Group) Co. Ltd., Xilinguole South Rd., Hohhot 010020, China.)
(Dispatching and Communication Center, Inner Mongolia Power (Group) Co. Ltd., Xilinguole South Rd., Hohhot 010020, China.)
Medium: journal article
Language(s): English
Published in: Journal of Energy Engineering, , n. 6, v. 143
Page(s): 04017056
DOI: 10.1061/(asce)ey.1943-7897.0000483
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)ey.1943-7897.0000483.
  • About this
    data sheet
  • Reference-ID
    10588574
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine