0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Classification of the Bid/No Bid Criteria – Factor Analysis

Author(s):
Medium: journal article
Language(s): English
Published in: Archives of Civil Engineering, , n. 4, v. 61
Page(s): 79-90
DOI: 10.1515/ace-2015-0037
Abstract:

For the construction company, tendering is the most popular way of acquiring contracts. The decision to participate in the tender needs to be made carefully, as it affects the condition of the company and is an important aspect in its quest for success. The bid/no bid decision making is a complex process involving a number of factors. The research carried out so far has mainly concerned the identification of the various kinds of influences on contractors’ bidding decisions. The researchers, on the basis of contractors’ opinions, created rank lists in an attempt to categorize the factors. In this paper the author employs factor analysis which belongs to basic methods of multi-dimensional data analysis. The paper’s aim is first to depict an output set of observed variables, that is bid/no bid factors, in terms of a smaller set of latent variables which cannot be directly observed and then to interpret the dependencies between them.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1515/ace-2015-0037.
  • About this
    data sheet
  • Reference-ID
    10476879
  • Published on:
    25/11/2020
  • Last updated on:
    25/11/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine