City Tunnel in Waidhofen an der Ybbs - difficulties facing near-surface tunnelling in creeping soil / Citytunnel Waidhofen an der Ybbs - Schwierigkeiten einer oberflächennahen Tunnelherstellung im Kriechhangbereich
Author(s): |
Markus Brunner
Ernst Enengl |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2011, n. 5, v. 4 |
Page(s): | 576-583 |
DOI: | 10.1002/geot.201100027 |
Abstract: |
The construction of the City Tunnel in Waidhofen an der Ybbs required not only the solution of problems specific to an inner-city infrastructure project but also flexible adaptation to the difficult geological conditions. |
Keywords: |
structure monitoring construction methods creep slope structural monitoring
|
Available from: | Refer to publisher |
- About this
data sheet - Reference-ID
10065756 - Published on:
06/10/2011 - Last updated on:
09/12/2014