0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

CIB Working Commission W55

Techniques for handling risk exposure and risk attitude associated with investments with uncertain outcomes are presented. Advantages and disadvantages of each technique described

Author(s):
Medium: journal article
Language(s): English
Published in: Bâtiment International / Building Research and Practice, , n. 2, v. 18
Page(s): 92-99
DOI: 10.1080/01823329008727019
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01823329008727019.
  • About this
    data sheet
  • Reference-ID
    10367713
  • Published on:
    28/08/2019
  • Last updated on:
    28/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine