Author(s): |
Naceur Kerkeni
Wolfgang Roeser |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Beton- und Stahlbetonbau, November 2014, n. 11, v. 109 |
Page(s): | 818-823 |
DOI: | 10.1002/best.201400055 |
Abstract: |
The Chio Bridge in AachenThe Chio-bridge in Aachen is an integral pedestrian bridge with an S-shaped floor plan. It is a cable stayed bridge with a 65 m high pylon. This paper describes the design and the building process. |
Keywords: |
bridges earthquake punching shear pre-stressed concrete Darrieus rotor
|
Available from: | Refer to publisher |
Structures and Projects
- About this
data sheet - Reference-ID
10070675 - Published on:
02/12/2014 - Last updated on:
04/02/2015