0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Change Orders in Iraqi Construction Projects

This publication lists 15 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10330194
  • Published on:
    26/07/2019
  • Last updated on:
    02/06/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine