0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Change Orders and Their Domino Effect: Insights from Public Construction Projects in the Kingdom of Saudi Arabia

This publication lists 40 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10810620
  • Published on:
    17/01/2025
  • Last updated on:
    25/01/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine