0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Change Orders and Schedule Performance of Design-Build Infrastructure Projects: Comparison between Highway and Water and Wastewater Projects

This publication lists 56 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10579994
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine