0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Change Orders and Lessons Learned: Knowledge from Statistical Analyses of Engineering Change Orders on Kentucky Highway Projects

This publication lists 27 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10166327
  • Published on:
    11/12/2018
  • Last updated on:
    11/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine