0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Change order effects on labor productivity and mitigation the effects by developing policies using system dynamic modeling: a case study in a construction project

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ijbpa-11-2022-0184.
  • About this
    data sheet
  • Reference-ID
    10738472
  • Published on:
    03/09/2023
  • Last updated on:
    03/09/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine