0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The challenges of implementing the EPBD recast (2010/31/EC) effectively, in order to untap its true potential

Author(s):
Medium: journal article
Language(s): English
Published in: Advances in Building Energy Research, , n. 2, v. 6
Page(s): 259-271
DOI: 10.1080/17512549.2012.740906
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/17512549.2012.740906.
  • About this
    data sheet
  • Reference-ID
    10476504
  • Published on:
    16/11/2020
  • Last updated on:
    16/11/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine