A challenge of an ultra-large section tunnel project in unconsolidated ground - design and construction of the Minoh toll road tunnel -
Medium: | journal article |
---|---|
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, July 2004, n. 4-5, v. 19 |
Page(s): | 464 |
DOI: | 10.1016/j.tust.2004.02.069 |
- About this
data sheet - Reference-ID
10126977 - Published on:
01/12/2018 - Last updated on:
01/12/2018