0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Causes of Ponding in Foundation Gallery of Fenhe Reservoir II Gravity Dam

Author(s):


Medium: journal article
Language(s): English
Published in: Journal of Physics: Conference Series, , n. 1, v. 2468
Page(s): 012090
DOI: 10.1088/1742-6596/2468/1/012090
Abstract:

The multi field coupling mechanism of seepage, stress and temperature coupling of concrete gravity dam is analyzed, and its coupling control equation is deduced. Based on the analysis of the temperature effect of cracked concrete dam, a three field coupling model of seepage, stress and temperature based on pore crack dual medium suitable for the characteristics of RCC gravity dam is established, and its implementation strategy in COMSOL Multiphysics is studied. The three-dimensional finite element model of the overflow dam of Fenhe Reservoir II is established, and the annual working behavior of the overflow dam section is simulated in COMSOL Multiphysics. The variation law of dam seepage characteristics under the coupling action of seepage, stress and temperature is obtained. It is considered that the ponding in the gallery mainly comes from the crack leakage, and the temperature and headwater elevation are the main factors affecting the crack leakage of the dam.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1088/1742-6596/2468/1/012090.
  • About this
    data sheet
  • Reference-ID
    10777397
  • Published on:
    12/05/2024
  • Last updated on:
    12/05/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine