0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Causes of cost overruns in building construction projects in Asian countries; Iran as a case study

This publication has been cited in the following 9 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10665190
  • Published on:
    09/05/2022
  • Last updated on:
    02/09/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine