0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Causes of Change Orders in the Jordanian Construction Industry

Author(s):

Medium: journal article
Language(s): English
Published in: Journal of Building Construction and Planning Research, , n. 4, v. 6
Page(s): 234-250
DOI: 10.4236/jbcpr.2018.64016

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.4236/jbcpr.2018.64016.
  • About this
    data sheet
  • Reference-ID
    10330038
  • Published on:
    26/07/2019
  • Last updated on:
    26/07/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine